Compatibility Test Suite

CTS testing,
as a service.

Send the device and the agreed build. B8N runs Android CTS, cuts through the noise and returns an engineer-reviewed account of what failed, why it matters and who should look at it next.

See what is included

More than a folder of
raw results.

A pass or fail total is not an engineering answer. The report ties each persistent failure to evidence, groups related tests into real problems, and keeps two things it never blurs: how sure a conclusion is, and how far the evidence has actually reached.

Credible run

A run you can trust

Host, device preparation, retries and incomplete modules are checked before any product defect is called.

Failure families

Grouped, not listed

Dozens of test methods become a smaller set of traceable engineering issues, with cascades separated from causes.

Classification

A responsible label

Every persistent failure is placed in one of seven ownership classes, from device configuration through to investigation required.

Evidence depth

How far it reaches

A fixed ladder: subsystem, interface, cause, candidate defect, then a fix validated by re-test. The claim never runs ahead of the rung it has reached.

Confidence

How sure it is

A separate dimension, from confirmed to unknown. A finding can pin the subsystem with confidence while the precise cause stays open.

Artefacts

Your original results

Raw CTS output, run identifiers and build context stay with you, for your own records and your own engineers.

Next action

A clear route forward

Each family names likely ownership and whether to configure, retest, investigate, escalate or ask the ODM to fix it.

Every failure gets a
responsible label.

One canonical set of seven classes, the same on the page, in the report and in the framework. Investigation required is an honest label, not a dead end; it is where deeper work can begin.

One build.
Four clear stages.

The engagement is deliberately small at the front door. It can end with a useful report, or continue into focused engineering when a failure genuinely needs it.

01

Scope

Agree the device, build, CTS release, test plan, prerequisites and what a comparable repeat build looks like.

02

Run

Prepare the device, execute CTS, protect test integrity and run controlled retries where they add evidence.

03

Interpret

Normalise, classify and trace persistent failures. Separate observed fact from inference and hypothesis.

04

Report

Deliver the raw artefacts, an engineer-reviewed report and a prioritised route to retest, investigate or remediate.

01 Scope02 Run03 Interpret04 Report

Clear about where
it stops.

B8N is an independent party: a separate resource that assesses the build, rather than the team that designed or built the device checking its own work. The value is that outside, interpreted read. The service is deliberately bounded, and the limits are stated up front so the fixed-fee report stays exactly that.

B8N is not an authorised Google certification laboratory. This service runs Android CTS and interprets the result; it does not promise GMS approval, or guarantee that a build will pass certification. Certification testing, certification readiness and formal certification are different things.
Not included
  • Open-ended source review
  • BSP, HAL, kernel or vendor debugging
  • Patch development or fix implementation
  • Changes to your or a supplier's source
  • Extended reproducer development
  • Formal certification or GMS approval
Shipping can be arranged for a fee. Otherwise customers are responsible for sending and collecting hardware for the period of the engagement.

Test first.
Investigate only where needed.

Start with a fixed-fee test and report. Go deeper only where a failure genuinely calls for it, and validate the fix when it lands.

Know what is failing.
Know what happens next.

Send the device model, Android version, target build, intended market, CTS version if known and any deadline already in motion.

Prefer your own mail app? Email directly.